So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
Wednesday, December 16, 2015
Unfinished Business
As 2015 draws to a close, it's only natural to look back at what was accomplished in the past year and to think about all that still needs to be done. The TMMC has come a long way this year, with the entire mainline now complete through the expansion areas, a more logical layout for the town, and scenic work well underway in Rainbow Caverns and Hanging Rock. Still, there's much yet to be done. So many projects in fact that at times it can be a little overwhelming and I start to wonder if maybe I haven't bitten off more than I can chew. Thunder Mesa isn't really a very big model railroad, but the high level of detail, scratchbuilt structures, animation and lighting effects means that progress can be rather slow at times. Still, my enthusiasm for the project remains high, and there are a number of projects that I'm looking forward to tackling in the new year.
So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
Well, at least the water tank is finished (but that might be moving to Hanging Rock). The current turntable here is unpowered and a hold-over from an earlier version of the railroad. I'd like to replace it this year with one of the fine A-frame TT's from Kitwood Hill Models. The engine house is planned as a white-plastered stone structure to harmonize with the adobe structures of nearby San Lorenzo. Time will tell if that plan pans out or I decide to go with something else. Obviously, the turntable approach track and engine house tracks are waiting for more permanent structures to be built. All of the track in this area needs paint, ballast and final detailing.
Labels:
backdrop,
bridges and trestles,
Calico Gold Co.,
Hanging Rock,
mock-ups,
Natural Bridge,
On18,
paper models,
scenery,
structures,
Thunder Mesa Mill,
Thunder Mesa Town,
track plans,
turntable
Monday, November 2, 2015
A Graphite "Solution" for Better Operations
Even though I clean regularly and treat all of the rail on Thunder Mesa with NO-OX (see last month's video log), I still find it useful to treat trouble spots here and there with graphite in order to improve electrical conductivity. In the past I've used graphite sticks for this but personally find them to be a bit messy and inexact. My goal is to get the proper amount of graphite right on the railhead where it's needed, and not in the rail web, ties or ballast. To that end, I've come up with an easy to make and use graphite solution that can be applied where needed with a paint brush. The solution is similar to the commercially available Neolube but is thinner, lasts a long time, and costs substantially less.
Anyway, I hope that some others will give this solution a try. It works well for me. Thanks for checking in, amigos. Adios for now!
![]() |
I start by sanding down almost an entire stick with some fine 220 grit sandpaper, catching all of the graphite dust in a wide, flat-bottomed plastic container. |
![]() |
Mix well with a soft brush, then test the solution on some scrap paper. It should go on a transparent medium gray - not black. If it's too thick, add more alcohol. |
![]() |
Sealed in its plastic container, one batch of graphite solution can last many, many months. If it dries out, simply add more alcohol to reactivate. |
Final Thoughts
I'm very pleased with my graphite solution and enjoy how well my short-wheelbase locomotives operate on the layout after applying it. I find it to be particularly useful on turnouts where just a dab between stock rails and points can greatly improve their electrical performance. However, when I first posted this idea on one of the model railroad forums I frequent, I was immediately taken to task for "over-applying" graphite. Dire consequences would ensue, I was warned, if I continued down this dangerous path. There would be short circuits, arcing, loss of traction, and power jumps across gaps with this blasphemous liquid. I was even told that only invisible, microscopic amounts of graphite should ever be placed on the rails, as if it had some magical homeopathic quality that would be destroyed if it was ever used in detectable amounts. I'd like to see the data on that. I have never experienced any of the dire consequences warned about and have only enjoyed happy railroading. It is true that less is indeed more when it comes to graphite, but you do actually need to get some on the rails for it to do any good. What you don't want is a pasty build-up and that is very easy to avoid.Anyway, I hope that some others will give this solution a try. It works well for me. Thanks for checking in, amigos. Adios for now!
Friday, October 30, 2015
Wednesday, October 28, 2015
Raildig Interview
The Marc F.Davis chuffs through Dinosaur Gap. One of 12 new photos featured in my Raildig interview. |
I was recently contacted by John Cubbin from Raildig.com who asked if I'd be interested in doing a guest interview about Thunder Mesa. I just love talking about the railroad and sharing ideas with other modelers so I readily agreed. The interview is live online today, along with 12 new photos of the Thunder Mesa layout. You can read it at this link.
Subscribe to:
Posts (Atom)

















