So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
Showing posts with label Hanging Rock. Show all posts
Showing posts with label Hanging Rock. Show all posts
Wednesday, December 16, 2015
Unfinished Business
As 2015 draws to a close, it's only natural to look back at what was accomplished in the past year and to think about all that still needs to be done. The TMMC has come a long way this year, with the entire mainline now complete through the expansion areas, a more logical layout for the town, and scenic work well underway in Rainbow Caverns and Hanging Rock. Still, there's much yet to be done. So many projects in fact that at times it can be a little overwhelming and I start to wonder if maybe I haven't bitten off more than I can chew. Thunder Mesa isn't really a very big model railroad, but the high level of detail, scratchbuilt structures, animation and lighting effects means that progress can be rather slow at times. Still, my enthusiasm for the project remains high, and there are a number of projects that I'm looking forward to tackling in the new year.
So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
So, without further ado, here's a look ahead at some of the TMMC's "unfinished business" that I'd like to get done in 2016.
Well, at least the water tank is finished (but that might be moving to Hanging Rock). The current turntable here is unpowered and a hold-over from an earlier version of the railroad. I'd like to replace it this year with one of the fine A-frame TT's from Kitwood Hill Models. The engine house is planned as a white-plastered stone structure to harmonize with the adobe structures of nearby San Lorenzo. Time will tell if that plan pans out or I decide to go with something else. Obviously, the turntable approach track and engine house tracks are waiting for more permanent structures to be built. All of the track in this area needs paint, ballast and final detailing.
Labels:
backdrop,
bridges and trestles,
Calico Gold Co.,
Hanging Rock,
mock-ups,
Natural Bridge,
On18,
paper models,
scenery,
structures,
Thunder Mesa Mill,
Thunder Mesa Town,
track plans,
turntable
Wednesday, September 30, 2015
The Story of Hanging Rock: Part II ~ Update and Video Log
Click here for part I
Ready or not, here comes an end of the month update from Thunder Mesa! I haven't had much time for updates this month but scenery work has been progressing on the Hanging Rock section of the layout, and I'm nearly finished with the structure build for Olson & Furlow's Saloon. Even with several things half done, I wanted to share an update and video log on how things are coming along.
Hanging Rockwork
Rockwork and coloring has been completed in the little canyon nook where Olson & Furlow's will find its home. It still needs ground cover, vegetation and other details but here's a quick rundown on how the scene has come together so far.![]() |
After the Sculptamold dries it's time for a coat of my scenery base color: Glidden "French Mustard" flat interior latex paint. |
![]() |
Then I darken the rocks with a spray of diluted black, letting it flow down into all of the cracks and crevices. |
Olson & Furlow's
The main structure in Hanging Rock is Olson & Furlow's Saloon and Store, an appropriately character filled establishment built as a tribute to two of may favorite model railroad authors of the past. I'll be writing much more about this scratch-built model for an upcoming column in Model Railroad Hobbyist Magazine so I don't want to give away too much here. Suffice to say that I wanted something with a lot of texture, charm and visual appeal to act as a focal point for the scene.![]() |
The colorful vintage signs and posters are a hint at the final super-detailing to come. |
![]() |
The old tarpaper roof on the store section has seen better days. The tarpaper was modeled using strips of 220 grit sandpaper painted flat black. The nail heads are tiny dabs of gray acrylic paint. |
There's More on Facebook
I'm so humbled and flattered by those who choose to follow my efforts here on this site and also on social media. Thunder Mesa's Facebook page recently surpassed 500 likes and that's not bad for a quirky little hobby like this. If you like this site I hope you'll also come over and join the conversation on Facebook. There's a lot of new stuff posted there first, mostly about this model railroad, but also interesting stuff about the larger worlds of railroading, model building, themed design and Disney. Thank you.That's all for this time, amigos. Thanks for checking in. Adios for now!
Friday, August 7, 2015
The Story of Hanging Rock: Part I
About halfway down the line between San Lorenzo and Thunder Mesa is the whistle-stop burg of Hanging Rock. There's a water tank there, and an old combine repurposed as a depot, but not too much else. In recent years, the labyrinth of canyons, caves and rock ledges have become a haven for horse-thieves, rustlers, bandits and other unsavory types. Before the coming of the railroad, it was an Indian stronghold, a natural rock fortress where a handful of braves once held off an entire regiment of U.S. soldiers. Legends of lost Spanish gold lured a few hearty prospectors to the area but they didn't find much and now their old, abandoned diggings dot the cliff-sides. The height of prosperity arrived with the railroad in the late 1870's when a construction camp was established there for bridges being built across Horse Thief and Coyote Canyons. A couple of enterprising old railway men named Olson & Furlow opened a saloon and small store for the camp workers and it still stands between the tracks today, a haunt for outlaws and the only going concern left in town. Hanging Rock is a good place for an ambush or a hide-out and most decent folks don't stay long.
![]() |
Hanging Rock Depot is an old combine left over from the construction camp days. The Olson & Furlow Saloon seems to be the only business left in town. |
Building Hanging Rock
With all of the mainline track now laid and a good start made on the branchline up to Big Thunder Camp, I've decided to dive right in to the scenery at Hanging Rock. As usual, I'm roughing everything in with layers of 1" thick pink polystyrene insulation foam held together with Powergrab adhesive and pins. I really want the cliffs to tower above the trains here. The dramatic sandstone ledges overhanging the track are what give Hanging Rock its name. Unlike some other scenes on the layout, Hanging Rock has no corollary at any Disney park. I wanted to do something entirely original here. Still, the scene is being designed with the same playful spirit and attention to story in mind.![]() |
A defunct Bachman combine is being pressed into service as a station. So far, the project hasn't progressed much beyond a coat of primer. |
![]() |
The water tank was built and modified from a Banta Model Works kit. I built it for Thunder Mesa yard but it's a little small and I kind of like it better here. It might just stay. |
The next step in building Hanging Rock will be to skin the foam with rocky-textured Sculptamold and add a few Balsa Foam detail carvings. Then the tunnel portals and interiors will need to be detailed and all of the rock work painted. After that, the structures get finished and ground cover, plants and final details will be added. There's always lots to do on Thunder Mesa so I'd better get cracking! I'm happy with the start I've made on Hanging Rock and very excited to finally be adding some scenery to the long-planned expansion areas. Thanks for checking in, amigos. Adios for now!
Click here for part II
Friday, July 31, 2015
Expansion Update and Video Log: Track Complete Through Hanging Rock and Coyote Canyon
Greetings from Thunder Mesa!
I'm back from my summer break and just spent the last week finishing up track laying and wiring on the new sections of the layout. About 30' of Peco On30 flextrack was installed across the Hanging Rock and Coyote Canyon sections, and over 40 soldered connections now bring DCC power to the rails. This is a major milestone toward completing the layout expansion and I'm very happy to have it done. Check out this month's video log for more details and a first-ever excursion over the entire mainline!![]() |
Shiny new rail above Coyote Canyon. The plywood bridges are temporary and can be easily removed. They'll be replaced with detailed models after I decide just what kind of bridges I want here. The 16" radius turn-back curve will be hidden in a tunnel below the portable On18 Calico layout. The breaker box will be hidden behind Calico Mountain itself. Installing an around-the-walls backdrop here is also high on the old to-do list. |
With the mainline track laid and operating well, I'll probably turn my attention to the branchline up to Big Thunder Camp next. I'm also itching to build some scenery and structures and might just dive right in to the scene at Hanging Rock. Time will tell. Thanks for stopping in for a visit, amigos. There's much more to come. Adios for now!
Subscribe to:
Posts (Atom)