Back in October of last year, my friend Verne Niner announced that he would be dismantling his legendary Estrella & Sonora Grande layout in order to move on to new projects. When he began to sell off the structures and equipment, I was lucky enough to call dibs on his wonderful San Lorenzo Village diorama. After months of planning, and a couple furious weeks of benchwork construction, I'm happy to report that the sleepy border town of San Lorenzo has been safely settled into its new home. The village now resides in a corner of the layout room on its own custom-built layout section. Physically, it's just down the aisle from Thunder Mesa town, but in operations, it will represent the far end of the railroad.
Here's an overhead view of the new 48"x66" San Lorenzo section. This piece of benchwork acts as a literal bridge between the central Thunder Mesa section and the Hanging Rock and Calico sections along the wall. Changes always happen during construction and I've altered the plan somewhat by changing the orientation of San Lorenzo. Now the track enters the village from the opposite direction via a wye, a much more logical arrangement if this is meant to represent the "far end of the line." This change also allows for the San Lorenzo track to connect to a narrow staging shelf that will be built along the wall. What I'll lose in aisle width should be more than made up for in enhanced operations. |
This section of benchwork will also house a large chunk of Rainbow Caverns. The foreground track will curve through three cavern scenes before emerging at Hanging Rock. |
That should bring everything up to date for this week. Now I'm just waiting for some more Peco On30 track components to arrive so I can finish up this section and get everything wired. As always, questions or comments are welcome below. Thanks for checking in, amigos, Adios for now!
No comments:
Post a Comment